Current time: 28-08-2014, 03:44 AM Hello There, Guest! LoginRegister)
View New Posts | View Today's Posts


Some Information About

case study for site selection for dam engineering geology ppt

is hidden..!! Click Here to show case study for site selection for dam engineering geology ppt's more details..
Do You Want To See More Details About "case study for site selection for dam engineering geology ppt" ? Then

.Ask Here..!

with your need/request , We will collect and show specific information of case study for site selection for dam engineering geology ppt's within short time.......So hurry to Ask now (No Registration , No fees ...its a free service from our side).....Our experts are ready to help you...

.Ask Here..!

In this page you may see case study for site selection for dam engineering geology ppt related pages link And You're currently viewing a stripped down version of content. open "Show Contents" to see content in proper format with attachments
Page / Author tags

DAMS


Posted by: projectsofme
Created at: Saturday 18th of December 2010 03:20:01 AM
Last Edited Or Replied at :Saturday 18th of December 2010 03:20:01 AM
project topics on earth dams , ppt construction of earthen dams, ppt on earthquake forces on dams , topics for presentation on dams, seminar project on gravity dam , civil engineering seminar project dam, forces acting on dams ppt , civil engg seminar project on embankment dam, seminar topics related to dam in civil , seminar earthan dam, civil engineering seminar topic on dams , embakment and gravity dam seminor topic pdf, seminar on dams , case study for site selection for dam engineering geology ppt, seminar on earthen dam , site selection for dam, selection of dam sites , stability of dam, dam semenar , seminar topics for civil engineering pdf on dam, ppt for bhakhra ,
COMPRESSIVE IN NATURE.
2. WATER PRESSURE
# THE DAM IS REQUIRED TO RESIST HORIZONTAL FORCES ACTING DUE TO WEIGHT OF THE WATER IMPOUNDED ON IT.
# THIS WATER PRESSURE CAN BE CALCULATED BY HYDROSTATIC PRESSURE DISTRIBUTION.

3. UPLIFT PRESSURE
# IT IS ALMOST IMPOSSIBLE TO MAKE A DAM IMPERVIOUS STRUCTURE .
# MANY MINUTE CRACKS AND PORES ARE LEFT IN THE DAM AND THE FOUNDATION BODY.
# WATER IS LIKELY TO FIND ITS WAY INTO THESE MINUTE OPENINGS THROUGH SEEPAGE AND GRADUALLY FILL THEM UP.
# IT EXERTS AN UPWARD PRESSURE ON THE BODY OF THE DAM WHICH IS,IN ..................[:=> Show Contents <=:]



DAMS


Posted by: projectsofme
Created at: Saturday 18th of December 2010 03:20:01 AM
Last Edited Or Replied at :Saturday 18th of December 2010 03:20:01 AM
project topics on earth dams, ppt construction of earthen dams , ppt on earthquake forces on dams, topics for presentation on dams , seminar project on gravity dam, civil engineering seminar project dam , forces acting on dams ppt, civil engg seminar project on embankment dam , seminar topics related to dam in civil, seminar earthan dam , civil engineering seminar topic on dams, embakment and gravity dam seminor topic pdf , seminar on dams, case study for site selection for dam engineering geology ppt , seminar on earthen dam, site selection for dam , selection of dam sites, stability of dam , dam semenar, seminar topics for civil engineering pdf on dam , ppt for bhakhra,
ROCK SHOULD BE EASILY FEASIBLE OR THE COST WILL INCREASE.
4.> ECONOMICALLY. -
BENEFITS ARISING SHOULD BE REALISTIC AND JUSTIFIED IN TERMS
OF LAND IRRIGATED OR POWER GENERATED OR FLOODS AVERTED
OR WATER STORED.

5.> ENVIRONMENTALLY. –
A. THE SITE OF THE DAM SHOULD NOT INVOLVE ECOLOGICAL DISORDER ( IN THE LIFEOF PLANTS,ANIMALS AND MAN).
B. THE FISHES IN THE STREAMS ARE ALSO AFFECTED , SO THINGS SHOULD ALSO BE CONSIDERED.
C. THE DAM AND THE ASSOCIATED RESEVOIR SHOULD BECOME AN ACCEPTABLE ELEMENT OF THE ECOLOGICA..................[:=> Show Contents <=:]



Cloud Plugin by Remshad Medappil